Close

> Manitoba Hydro Place

Winnipeg, MB, Canada

Prev Next
  • Overview

    This headquarter building for Manitoba Hydro Corporation, situated in a cold region, is being designed using an integrated design process to C-2000 and LEED standards and has targeted a 60% saving in energy.

  • Services

    • Pedestrian wind comfort
    • Evaluated steel column temperatures during fire event
    • Atrium smoke management / natural ventilation
    • Hydro steel column temperature
    • Ground level snow drifting
    • Exhaust re-entrainment
    • Cladding wind loads
  • Benefits

    Increased safety: Assist in the development of a smoke management system for the Atria.

    Security:  Knowledge gained from the evaluation of the performance of smoke management systems.

    Cost savings: Potential savings realized from assessing cladding wind loads on glazing.

    Safety: Assessed the structural strength of the columns under extreme heat conditions in the event of a fire.

    Operational and safety: Identify areas of snowdrift patterns around the site and on the roof of the building.

    Reduced risk: Building exhaust and intake design optimization.

    Reduced energy cost: Optimized ventilation design to increase possibilities for natural ventilation.

  • Award